We did a lot of works, let's share some with you

CASE

Public housing estates with 500 sq sheet. The owner would like to ........ everything start with zero

Renovation included

Painting​, Electricity, Water Plumbing, Demolition and Masonry, Wood and Furniture and many others

The renovation still in process, assume project completed within 2.5 months

Fung Shing Court @ Shatin (ENFOLDRCS0012)

Kam Fung Court @ Ma On Shan (ENFOLDRCS0005)

MOSPL-0011
MOSPL-0006
MOSPL-0001
MOSPL-0010
MOSPL-0017
MOSPL-0013

Public housing estates with 500 sq sheet. This is the first time for the house owner to own his own flat. The existing floor and sturcture is good enough. No need firther renovation. 

 

Renovation included

​1. Painting - Ceiling, Wall, including 4 rooms, paint Sealer, Plaster and Sandpaper. And then Painting

2. Electricity - Relocate TV Plug, BB Plug, Electric Plug from the right of living room to left

Customer would like to relocate all wall plugs from the left of living room to right. We normally hide the line on floor. However, the existing floor in a very good condition, we will not renovate the floor. Therefore, we have to hide the line on wall and ceiling. 

Kennedy Town (ENFOLDRCS0004)

ENFRCS0004-0013
ENFRCS0004-0002
ENFRCS0004-0003
ENFRCS0004-0005
ENFRCS0004-0007
ENFRCS0004-0015
ENFRCS0004-0012
ENFRCS0004-0010
ENFRCS0004-0009
ENFRCS0004-0011

A flat in Kennedy Town. Customer owned and lived there for over 10 years. There are many mold, cracks and flaking at Ceilings and walls. The toilet tank also cracked

Renovation included

1. Painting - All rooms, ceilings and walls, shovel the original bottom, paint with Sealer, Plaster and Sandpaper, and Painting

2. Demolition and Masonry - Remove all fuinture in a room and also the tank in washroom 

3. Water Plumbing - Toilet platform Plumbing

Customer would like to renovate her flat after lived there for 10 years. But she has a budget concern. Customer would not move all her existing belongings in the flat. We don't have enough space to work on on site. We suggest the customer to deal with furniture company directly although the quality is not as good as work on site. We promise the customer to complete the whole job within 7-8 days so that customer no need to rent a monthly hotel room. Finally, we success to womplete in 7 days, and help customer to save at least HKD20,000

Siu Kwai Court @ Tuen Mun (ENFOLDRCS0009)

20160817_125734
Debby Room

Customer lived there for over 20 years. The main renovation is a bedroom and also some minor stuffs inside the flat

Renovation included

1. Demolition and Masonry - Remove all stuffs in the bedroom 

2. Electricity - Allocate all electric plugs in order to fit the new furniture

3. Painting - Shovel the original bottom, Paint with Sealer, Plaster and Sandpaper, and Painting

The sister of our customer will come back and live together. There are not enough space for us to work on furniture on site. We suggest customer to deal with furniture. Comple the whole project within 5 days

Residence Oasis @ Tseung Kwan O (ENFOLDRCS0001)

20091212-NH-0005

Don't like Blamck and White? Let's go green!

Renovation Included

1. Painting - Plaster and Sandpaper, And Painting

- Paint 

Customer would like to change the color in order to match their new style and furniture. 

Residence Oasis @ Tseung Kwan O (ENFOLDRCS0002)

20160510_184337(1)
20160510_184713
20160510_184430(1)

Use the most simple design to work out the most stuffs

Renovation included

1. Design

2. Painting - Shovel the original bottom, Paint with Sealer, Plaster and Sandpaper, and Painting

3. Demolition and Masonry - Remove the whole washroom in the master room

4. Electricity - reformat all electric and water plumbing after remove the toilet

5. Wood and Furniture - New Floor

Customer don't want to have two washroom. And they like simple, they like fasion and get a lot of clothes. Remove the washroom in the master room, develop two big wardrobe. The whole flat mainly use Black, Grey and White. Use more Black Glass or Mirror. To be honest..... the whole project only cost less than HKD100,000

Tin Wan @ Shatin (ENFOLDRCS0016)

20160910_095536
20160910_095538
20160910_095537
20160910_112427
20160910_112520
20160910_112506
20160910_112454
20160917_111703
20160917_113010
20160919_121515
20160919_121649

An old building in Tin Wan. Need some renovation at the roof

Renovation included

Demolition: Rooftop split-wire fence, clearing more than garbage
Masonry:  make the surface flat, flat all cracks and holes
Painting : Paint water-oil base SKK

LLHP-SW-00025
LLHP-SW-00005
LLHP-SW-00030
LLHP-SW-00007
LLHP-SW-00033
LLHP-SW-00034
LLHP-SW-00038
LLHP-SW-00039
LLHP-SW-00040
LLHP-SW-00045
LLHP-SW-00046
LLHP-SW-00051
LLHP-SW-00054
LLHP-SW-00055
LLHP-SW-00056
LLHP-SW-00058
LLHP-SW-00061
LLHP-SW-00059
LLHP-SW-00060
LLHP-SW-00064
LLHP-SW-00067
LLHP-SW-00066
LLHP-SW-00068
LLHP-SW-00069
LLHP-SW-00070